The freight decision is usually made on rate per kilo. That is the smallest part of the calculation for industrial goods.
Ocean freight for a full container is cheap per unit but slow: four to six weeks door to door including port handling, and that is before customs delays. Air is days but at eight to twelve times the per-kilo rate. Rail sits between them for Europe and Central Asia.
The missing term is inventory carrying cost. Goods in transit are capital you have paid for and cannot sell. At a typical 15-20 percent annual carrying cost, five extra weeks of transit costs roughly 1.5-2 percent of the goods value — which is often smaller than the freight difference, but not always.
The other missing term is stockout risk. If late delivery means a production line stops, the cost is not the freight difference, it is the downtime. That is why critical spares fly and bulk consumables sail.
A workable policy for most industrial importers: ocean for planned consumption with a buffer, air for urgent replenishment and for the first order of a new part where you need to validate before committing inventory, and rail where the destination makes it competitive.
Dimensional weight catches people out on air freight. Carriers charge on volumetric weight for low-density cargo, so a pallet of empty housings can be billed at several times its actual weight. Calculate both and use the higher.
One more consideration: consolidation. Shipping a single pallet by ocean is often more expensive per unit than air, because you pay for a slot regardless. If your volume is small, consolidating with other suppliers — or buying through a distributor who already consolidates — is usually cheaper than optimising the mode.